Noroccidental

Deutschland online bookmaker http://artbetting.de/bet365/ 100% Bonus.

Noroccidental in Action

We share some works in which we successfully participated with an important contribution for our country

Lifting  and positioning of trusses and upper structure of the Bicentennial Convention Center

Transport and Assembly of three tunnel boring machines TBM Boring Machine TBM Quito Metro Project Line # 1 

Transportation of special equipment for the Mirador Zamora-Ecuador mining project Ecuacorriente SA ECSA

Mobilization of a drilling tower Chachimbiro Geothermal Project 

La Tola and Jose Vinueza Bridges Transport and Bridge Assembly - Ruta Viva

Special Equipment Transport and Assembly - Hydroelectric Project TOACHI PILATON 

Lease of a crane for the Jipijapa station of the Metro de Quito and dissassembly of runway ( 105 Tons 35 meters long                      

Door to Door Service Rig 2000 HP

 

            River Transport and special equipment for HARBIN – CELEC EP                      

Transport engineering and special equipment movement for Esmeraldas Refinery final stage up-grade

Position of Bridge’s beams for Latacunga side-road and for the Road’s interchanger “Ruta Viva” Pifo

                          State Esmeraldas Refinery’s power increasing                                     

Withdrawl of a Tranformer of 120 Tons from the substation El Inga

 Moving of equipment for Sopladora Hydrolectric Project

 

Mounting Collas’ Bridges 1 and 2, North entrance new Airport Quito

Guangopolo  II Project Moto-generators weight 154 tons e.a.

Bridge El Rosario Ravine

Ecuadorian Mega Constructions

Download Template Joomla 3.0 free theme.