First of four Production Separators Cap. 180.000 bls assemblied in Ecuador delivered to bloque 43 - ITT, We congratulate PAM_EP for developing and supporting Ecuadorian Companies.
Transpooling of flexible pipeline weight 194 tons & 9.5 mts of diameter. This is transcendent logistic milestone in the country, solid planning, engineering and high technical standard of Ecuadorian companies.
Mounting Conveyor Belt total weight 220 Conveyor Belt Assembly, Composed of 3 sections, Total weight 220 Ton at 50 meters height. 1 Crane capacity 250 Ton and 2 Cranes Liebherr capacity 500 Ton.
Noroccidental awarded as national winners of the Safest Transportation Company Project. Commited with the safety in our roads and the prevention of road traffic accidents.
Video